1 Star 0 Fork 40

秦飞/multipath-tools

加入 Gitee
与超过 1200万 开发者一起发现、参与优秀开源项目,私有仓库也完全免费 :)
免费加入
文件
该仓库未声明开源许可证文件(LICENSE),使用请关注具体项目描述及其代码上游依赖。
克隆/下载
0001-change-order-of-multipath.rules.patch 1.61 KB
一键复制 编辑 原始数据 按行查看 历史
wangzhiqiang 提交于 2024-02-05 16:52 . upgrade version to 0.9.5
From dc58ea0d1f812c81b8dba9c327272a90b84d2005 Mon Sep 17 00:00:00 2001
From: Benjamin Marzinski <bmarzins@redhat.com>
Date: Fri, 15 May 2015 18:14:09 -0500
Subject: [PATCH 1/2] change order of multipath.rules
At least for RedHat, the rule that calls scsi_id is
60-persistent-storage.rules, so the multipath rule needs to come
after this.
Signed-off-by: Benjamin Marzinski <bmarzins@redhat.com>
---
multipath/Makefile | 4 ++--
1 file changed, 2 insertions(+), 2 deletions(-)
diff --git a/multipath/Makefile b/multipath/Makefile
index 73db991..b3c2cc8 100644
--- a/multipath/Makefile
+++ b/multipath/Makefile
@@ -24,7 +24,7 @@ install:
$(Q)$(INSTALL_PROGRAM) -m 755 $(EXEC) $(DESTDIR)$(bindir)/
$(Q)$(INSTALL_PROGRAM) -d $(DESTDIR)$(udevrulesdir)
$(Q)$(INSTALL_PROGRAM) -m 644 11-dm-mpath.rules $(DESTDIR)$(udevrulesdir)
- $(Q)$(INSTALL_PROGRAM) -m 644 multipath.rules $(DESTDIR)$(udevrulesdir)/56-multipath.rules
+ $(Q)$(INSTALL_PROGRAM) -m 644 multipath.rules $(DESTDIR)$(udevrulesdir)/62-multipath.rules
$(Q)$(INSTALL_PROGRAM) -d $(DESTDIR)$(modulesloaddir)
$(Q)$(INSTALL_PROGRAM) -m 644 modules-load.conf $(DESTDIR)$(modulesloaddir)/multipath.conf
$(Q)$(INSTALL_PROGRAM) -d $(DESTDIR)$(tmpfilesdir)
@@ -44,7 +44,7 @@ uninstall:
$(Q)$(RM) $(DESTDIR)$(udevrulesdir)/11-dm-mpath.rules
$(Q)$(RM) $(DESTDIR)$(modulesloaddir)/multipath.conf
$(Q)$(RM) $(DESTDIR)$(modulesloaddir)/scsi_dh.conf
- $(Q)$(RM) $(DESTDIR)$(libudevdir)/rules.d/56-multipath.rules
+ $(Q)$(RM) $(DESTDIR)$(libudevdir)/rules.d/62-multipath.rules
$(Q)$(RM) $(DESTDIR)$(mandir)/man8/$(EXEC).8
$(Q)$(RM) $(DESTDIR)$(mandir)/man5/$(EXEC).conf.5
--
2.33.0
Loading...
马建仓 AI 助手
尝试更多
代码解读
代码找茬
代码优化
1
https://gitee.com/qin-fei-1/multipath-tools.git
git@gitee.com:qin-fei-1/multipath-tools.git
qin-fei-1
multipath-tools
multipath-tools
master

搜索帮助