20 Star 0 Fork 40

openEuler-RISC-V/multipath-tools

加入 Gitee
与超过 1200万 开发者一起发现、参与优秀开源项目,私有仓库也完全免费 :)
免费加入
文件
该仓库未声明开源许可证文件(LICENSE),使用请关注具体项目描述及其代码上游依赖。
克隆/下载
0001-change-order-of-multipath.rules.patch 1.47 KB
一键复制 编辑 原始数据 按行查看 历史
lixiaokeng 提交于 2021-11-23 21:49 . upgrade to 0.8.7
From d025415810a5792c333e99bd2f77a902c235ea09 Mon Sep 17 00:00:00 2001
From: Benjamin Marzinski <bmarzins@redhat.com>
Date: Fri, 15 May 2015 18:14:09 -0500
Subject: [PATCH 01/15] change order of multipath.rules
At least for RedHat, the rule that calls scsi_id is
60-persistent-storage.rules, so the multipath rule needs to come
after this.
Signed-off-by: Benjamin Marzinski <bmarzins@redhat.com>
---
multipath/Makefile | 4 ++--
1 file changed, 2 insertions(+), 2 deletions(-)
diff --git a/multipath/Makefile b/multipath/Makefile
index 0828a8f..b9bbb3c 100644
--- a/multipath/Makefile
+++ b/multipath/Makefile
@@ -24,7 +24,7 @@ install:
$(INSTALL_PROGRAM) -m 755 $(EXEC) $(DESTDIR)$(bindir)/
$(INSTALL_PROGRAM) -d $(DESTDIR)$(udevrulesdir)
$(INSTALL_PROGRAM) -m 644 11-dm-mpath.rules $(DESTDIR)$(udevrulesdir)
- $(INSTALL_PROGRAM) -m 644 $(EXEC).rules $(DESTDIR)$(libudevdir)/rules.d/56-multipath.rules
+ $(INSTALL_PROGRAM) -m 644 $(EXEC).rules $(DESTDIR)$(libudevdir)/rules.d/62-multipath.rules
$(INSTALL_PROGRAM) -d $(DESTDIR)$(man8dir)
$(INSTALL_PROGRAM) -m 644 $(EXEC).8.gz $(DESTDIR)$(man8dir)
$(INSTALL_PROGRAM) -d $(DESTDIR)$(man5dir)
@@ -33,7 +33,7 @@ install:
uninstall:
$(RM) $(DESTDIR)$(bindir)/$(EXEC)
$(RM) $(DESTDIR)$(udevrulesdir)/11-dm-mpath.rules
- $(RM) $(DESTDIR)$(libudevdir)/rules.d/56-multipath.rules
+ $(RM) $(DESTDIR)$(libudevdir)/rules.d/62-multipath.rules
$(RM) $(DESTDIR)$(man8dir)/$(EXEC).8.gz
$(RM) $(DESTDIR)$(man5dir)/$(EXEC).conf.5.gz
--
1.8.3.1
Loading...
马建仓 AI 助手
尝试更多
代码解读
代码找茬
代码优化
1
https://gitee.com/openeuler-risc-v/multipath-tools.git
git@gitee.com:openeuler-risc-v/multipath-tools.git
openeuler-risc-v
multipath-tools
multipath-tools
master

搜索帮助